Jump to year -> [1962-09-24] [1987-03-01] [1987-06-01] [1987-12-01] [2003-02-01] [2003-05-01] [2003-06-01] [2010-03-01]
[Phase]: Construction Documents

Documents below are listed chronologically. Use the links on the left or below to filter documents by keyword. Use the links above to jump to a specific year on this page.

Number of files: 22


    1962-09-24---------Jump to [Top]
  1. Douglas Point Project, by D.L.S. Bate, OPG, 1962-09-24. Doc type: Report.
    Summary: Description of the progress in designing and constructing the Douglas Point Project, a 200 MW nuclear power plant.
    Keywords: [Concept] General [SI] 00000 General Project [Discipline] General Engineering [Topic] Intro and Overview [Phase] Construction Design [Audience] Engineer Manager Technician
    - Status Report DP-Status-Sept1962.pdf (2380 kb)

  2. 1987-03-01---------Jump to [Top]
  3. Nuclear Journal of Canada, 1987 Vol 1 No. 1, by W.G. Morison, W. J. Penn, K. Hassmann, J.D. Stevenson, K. Elisson, CNS, 1987-03-01. Doc type: Paper.
    Summary: This paper provides a summary of the designs and capabilities of principal containment systems associated with BWR, PWR, and PHWR reactors in operation and under construction in the United States, Canada, West Germany, and Sweden. The many conceptual differences in design and modes of operation following accidents are briefly described, with commentary on their evolution and alternatives considered.
    Keywords: [Concept] Component Design Details [SI] 20000 Buildings and Structures [Discipline] Civil Engineering Nuclear Engineering [Topic] Conceptual [Phase] Concept Construction Design [Audience] College Engineer Grad Ugrad
    - Containment Systems Capability NJC-1-1-08.pdf (1131 kb)
    - Chemistry Control at Bruce NGS 'B' from Construction to Commercial Operation NJC-1-1-09.pdf (382 kb)

  4. 1987-06-01---------Jump to [Top]
  5. Nuclear Journal of Canada, 1987 Vol 1 No. 2, by J.L. Gray, CNS, 1987-06-01. Doc type: Paper.
    Summary: This paper identifies about twenty major decisions of the Canadian Nuclear Power Program from its inception in 1942 to maturity - the decision of Ontario Hydro to complete the Pickering Nuclear Power Station and proceed with a major nuclear power installation program. The decisions are discussed briefly.
    Keywords: [Concept] - [SI] 00000 General Project [Discipline] Nuclear Engineering [Topic] Intro and Overview [Phase] Concept Construction Operation [Audience] College Engineer Grad Manager Technician Ugrad
    - Early Decisions in the Development of the CANDU Program NJC-1-2-02.pdf (719 kb)

  6. 1987-12-01---------Jump to [Top]
  7. Nuclear Journal of Canada, 1987 Vol 1 No. 4, by J.F. Lafortune, C.A. McDevitt, and S. Poolpol, CNS, 1987-12-01. Doc type: Paper.
    Summary: CANDU reactor containment buildings are checked for integrity every five years. An on-line test could be performed more often, thereby reducing long-term unavailability of the containment system. A test procedure which accounts for operational factors is proposed.
    Keywords: [Concept] Component Design Details [SI] 20000 Buildings and Structures [Discipline] Civil Engineering Nuclear Engineering [Topic] Conceptual [Phase] Concept Construction Design [Audience] College Engineer Grad Ugrad
    - Suitability Study of On-Line Leak Tests for CANDU Single-Unit Containment Buildings NJC-1-4-05.pdf (846 kb)

  8. 2003-02-01---------Jump to [Top]
  9. Qinshan CANDU Project Construction Experiences and Lessons Learned to Reduce Capital Costs and Schedule Based on Qinshan CANDU Project in China, by Ken Petrunik, Kang Rixin, AECL, 2003-02-01. Doc type: Paper.
    Summary:
    Keywords: [Concept] - [SI] 03000 Engineering Science and Technology [Discipline] General Engineering [Topic] Intro and Overview [Phase] Construction [Audience] College Engineer Ugrad
    - 20031701.pdf (1470 kb)
    - 20031901.pdf (513 kb)

  10. 2003-05-01---------Jump to [Top]
  11. Chemistry Control Requirements for Generic CANDU Power Stations, by Stu Groom, NB Power, 2003-05-01. Doc type: Presentation.
    Summary: A series of presentations by Stu Groom to the Karachi Nuclear Power Plant (KANUPP) in May 2003 as a part of an IAEA 5-day training program to review the chemistry control requirements of the Karachi Nuclear Power Plant.
    Keywords: [Concept] - [SI] 03000 Engineering Science and Technology [Discipline] General Engineering [Topic] Intro and Overview [Phase] Construction [Audience] College Engineer Ugrad
    - Basic Chemistry Concepts 20032101.pdf (833 kb)
    - Moderator System Chemistry Control 20032102.pdf (264 kb)
    - Annulus Gas System Chemistry Control 20032103.pdf (362 kb)
    - Primary Heat Transport System Chemistry Control 20032104.pdf (667 kb)
    - Feeder Thinning 20032105.pdf (600 kb)
    - Boiler Feedwater / Condensate Chemistry Control 20032106.pdf (605 kb)
    - Steam Generator Chemistry Control 20032107.pdf (430 kb)
    - ECC and Dousing Systems Chemistry Control 20032108.pdf (116 kb)
    - Spent Fuel Bay Chemistry Control 20032109.pdf (85 kb)
    - Plant Chemistry Controm - PLGS Manual 20032110.pdf (4826 kb)
    - PHT System Chemitry Monitoring and Control Improvements 20032111.pdf (753 kb)
    - Chemistry Laboratory Analytical Procedure – Gadolinium Arsenazo III 20032112.pdf (175 kb)
    - Chemistry Specifications 20032113.pdf (119 kb)

  12. 2003-06-01---------Jump to [Top]
  13. Qinshan Project, by Ken Petrunik, AECL, 2003-06-01. Doc type: Presentation.
    Summary:
    Keywords: [Concept] - [SI] 03000 Engineering Science and Technology [Discipline] General Engineering [Topic] Intro and Overview [Phase] Construction [Audience] College Engineer Ugrad
    - CNS 2003 Conference Paper 20031801.pdf (3687 kb)

  14. 2010-03-01---------Jump to [Top]
  15. Why Ontario Generates So Much Electricity from Nuclear Energy, by Lorne G. McConnell, CNA, 2010-03-01. Doc type: Paper.
    Summary: This historical review provides an excellent summary of the context in which CANDU was conceived, designed, built, commissioned and operated. The origins of some of the major characteristic features of CANDU are also given. Note: Figure G3 herein is a corrected version of the original published version which contained a scale error.
    Keywords: [Concept] - [SI] 00000 General Project [Discipline] History [Topic] Intro and Overview [Phase] Commissioning Concept Construction Design Operation [Audience] College
    - 20100500.pdf (5844 kb)
---end of page---