[Phase]: Commissioning Documents

Documents below are listed chronologically. Use the links on the left or below to filter documents by keyword. Use the links above to jump to a specific year on this page.

Number of files: 9


    1962-09-01---------Jump to [Top]
  1. NDP Startup Trouble Spots, OPG, 1962-09-01. Doc type: Paper.
    Summary: Short report on the main trouble spots in NPD startup.
    Keywords: [Concept] Generic Design Issues [SI] 90000 Operations and Commissioning [Discipline] General Engineering [Topic] Performance [Phase] Commissioning [Audience] Engineer Manager Technician
    - Pumps, instrument tubing main trouble spots NDP-Startup1962.pdf (92 kb)

  2. 1971-09-06---------Jump to [Top]
  3. Commissioning and Operating Experience with Canadian Nuclear Electric Stations, by L. W. Woodhead, D. C. Milley, K. E. Elston, E.P. Horton, A. Dahlinger and R.C. Johnston, AECL, 1971-09-06. Doc type: Report.
    Summary:  
    Keywords: [Concept] - [SI] 90000 Operations and Commissioning [Discipline] Nuclear Engineering [Topic] Performance [Phase] Commissioning Operation [Audience] Engineer Manager Technician
    - Paper No. A/Conf. 49/A/148 presented at the Fourth U.N. International Conference on the Peaceful Uses of Atomic Energy, Geneva, 6-16 September, 1971 19710101.pdf (965 kb)

  4. 1980-01-01---------Jump to [Top]
  5. Fundamentals of CANDU Reactor Nuclear Design (TDAI-244), by A.A. Pasanen, AECL, 1980-01-01. Doc type: Report.
    Summary: A Lecture Series given at Trieste 22 January - 28 March 1980, TDAI-244 1980 August
    Keywords: [Concept] - [SI] 31000 Reactor 37000 Fuel [Discipline] Nuclear Engineering Physics [Topic] Fuel Management Reactor Physics [Phase] Commissioning [Audience] Engineer Manager Ugrad
    - Chapter 4 - Initial Fuel Loading Determination 20042004.pdf (379 kb)
    - Chapter 5 - Physics Analysis and Tests Related to Commissioning 20042005.pdf (764 kb)

  6. 1987-03-01---------Jump to [Top]
  7. Nuclear Journal of Canada, 1987 Vol 1 No. 1, by J.G. Roberts, CNS, 1987-03-01. Doc type: Paper.
    Summary: Pre-operational storage chemistry and flushing of the secondary side is described. The approach devised for Bruce NGS 'B' Unit 6 was unique for an Ontario Hydro Nuclear Unit. The significance of the improved Construction installation and Quality Assurance procedures, combined with those of Operations is identified. Secondary side chemistry during both commissioning and later operation is reported. It will be shown that the application of ALARA (As Low As is Reasonably Achievable) concept has resulted in tighter chemical specifications being met.
    Keywords: [Concept] Chemistry and Corrosion [SI] 36000 Steam Generator Steam and Water Systems [Discipline] Chemistry [Topic] Corrosion [Phase] Commissioning Construction Operation [Audience] College Engineer Grad Technician Ugrad
    - Chemistry Control at Bruce NGS 'B' from Construction to Commercial Operation NJC-1-1-09.pdf (382 kb)

  8. 2000-09-13---------Jump to [Top]
  9. Safety Analysis Technology: Evolution, Revolution and the Drive to Re-Establish Margins, by John C Luxat, OPG, 2000-09-13. Doc type: Presentation.
    Summary: A historical perspective of the evolution of safety analysis technology at OPG is presented below. The key elements of the new safety analysis methodology are then described together with its relationship to other components of Canadian nuclear safety technology. This development is placed in context with similar work being conducted in the international Light Water Reactor (LWR) community.
    Keywords: [Concept] - [SI] 31000 Reactor [Discipline] Nuclear Engineering [Topic] Performance [Phase] Commissioning Design Operation Safety [Audience] Engineer Technician
    - 20000301.pdf (256 kb)

  10. 2002-05-01---------Jump to [Top]
  11. Testing the Dynamics of Shutdown Systems, by Oszvald Glockler, OPG, 2002-05-01. Doc type: Paper.
    Summary:
    Keywords: [Concept] - [SI] 31000 Reactor [Discipline] Electrical Engineering [Topic] Performance [Phase] Commissioning Operation [Audience] Engineer Technician
    - Instrumentation in Reactor Trip Measurements 20030501.pdf (153 kb)
  12. Reactor Noise Measurements in the Safety and Regulating Systems of CANDU Stations, by Oszvald Glockler, OPG, 2002-05-01. Doc type: Paper.
    Summary:
    Keywords: [Concept] - [SI] 31000 Reactor [Discipline] Electrical Engineering [Topic] Performance [Phase] Commissioning Operation [Audience] Engineer Technician
    - 20030601.pdf (242 kb)

  13. 2010-03-01---------Jump to [Top]
  14. Why Ontario Generates So Much Electricity from Nuclear Energy, by Lorne G. McConnell, CNA, 2010-03-01. Doc type: Paper.
    Summary: This historical review provides an excellent summary of the context in which CANDU was conceived, designed, built, commissioned and operated. The origins of some of the major characteristic features of CANDU are also given. Note: Figure G3 herein is a corrected version of the original published version which contained a scale error.
    Keywords: [Concept] - [SI] 00000 General Project [Discipline] History [Topic] Intro and Overview [Phase] Commissioning Concept Construction Design Operation [Audience] College
    - 20100500.pdf (5844 kb)